T27731 - Tbilisi Hills Development and Construction LLC (hereinafter Client) announces a tender on construction of 4 villas

  • გამომცხადებელი: თბილისი ჰილს დეველოპმენტ ენდ კონსტრაკშენი
  • შესყიდვის ტიპი: განცხადება
  • წინადადების მიღება მთავრდება: 8 სექტემბერი 2025 დრო 18:00

დარჩენილია

-

დღე

:

-

სთ

:

-

წთ

:

-

წმ

Tender Description:

Tbilisi Hills Golf & Residences is the largest development project, which has no analogs on the Georgian market as it combines premium class residential properties and professional golf course. The territory is located in Village Teleti, Gardabani Municipality, close to Krtsanisi district, the south-east part of Tbilisi, and covers 331 ha. Tbilisi Hills going to build up to 380 private houses, 73 semi-detached houses, 20 units of 5-floor residential buildings with up to 800 apartments, and infrastructure objects. In addition, the company is developing infrastructure facility, such as roads, parking lots power grid and water supply lines. The total upcoming construction volume is above 300 mln USD.

Construction works are implemented under the management and supervision of Tbilisi Hills Development and Construction LLC. Only high-quality building materials and modern technology are used in construction, which ensures the success of the project.

Tbilisi Hills Development and Construction LLC (hereinafter Client) announces a tender on construction of 4 villas. 

Tender consists of 1 (One) lot
Construction of RC structure and block works.

Qualification of tenderers:

Tenderers shall be construction company with the proof record of minimum 5 years’ experience in a similar type of projects.  

Description of the project.

The project will be managed by Tbilisi Hills Development and Construction company team.

Tbilisi Hills will take over the site prepared for further activities – excavated foundation. Arrangement of construction site (Fence, site office) should be done by Contractor.

The tender proposal shall contain the following information:

  • Company name, identification code, legal and actual address, official e-mail;
  • Name of at least 2 (two) contact persons, indicating their contact telephone number, e-mail address, and position within the company;
  •  A certificate from the LEPL Revenue Service that bidder has fulfilled all obligations and has no debt to the state budget;
  •  Information about the work performance and warranty terms;
  •  Payment terms, incl advance % if any
  • Detail time schedule for works including indicated resources/manpower (MS Project);
  • Price proposal (For proper evaluating contractor should fill excel file BOQ)
  • A list of earlier performed projects with the brief description of provided services, indication of total price and project timeline;
  •  Copies or originals of Recommendation letters from 3 different clients issued over the past three years for past or ongoing projects to demonstrate the proved relevant performance of company in construction activity.
  •  Project organizational structure
  • Key personnel CV`s, incl project managers, site managers, HSE manager.
  • Comments on contract draft if any. 

All provided documentation should be in English

Necessary financial conditions for participation in the tender:

The legal entity participating in the tender shall have performed a similar type of work, from January 1, 2020, to the date of submission of the tender proposal, and the total cost of executed works shall be no less 5’000’000 GEL (Five million GEL);

Date and place of work:

Starting date of project execution is end of September 2025

Contractor will be allowed to work 6 days in a week. Monday – Friday working hours will be limited 08.00 am – 20.00 pm. Saturday working hours will be limited 10.00 am – 20.00 pm. Exceptions will be made for a special works required non-stop processing, submitted and approved by the client in advance.

Place of work – Tbilisi Hills Golf and Residences, Village Teleti, Gardabani Municipality, Georgia.

Work acceptance:

Payment will be made in stages, no more than once in month, based on the acceptance certificate signed between the parties.

The works stipulated by the contract shall be considered as completed and delivered when it is approved by the authorized representative of the Client and/or a third-party consultant assigned by Client.

On the basis of full performance and acceptance of the works, the parties shall conclude the final acceptance-delivery act.

Sub-contract­ing and other contractors:

The Contractor may subcontract part of the works to his Subcontractor only with pre-approval of the THDC in writing. Subcontracting shall not alter the Contractor's obligations.  Not more than 50% of the work may be sub-contracted if company will participate in separate lots. This requirement does not apply to the general contractor.

Insurance:

The bidder shall, at its sole expense, take out and maintain in effect at all times during his performance, adequate insurance policies, including but not limited to for its employees, vehicles, and the works executed by it in relation to the agreement with licensed insurers acceptable to the Client.

Payment terms:

Payment will be made within 7 working days after the signing accept delivery act by both parties. No more then one execution (IPC) will be approved in a month.

Upon completion of the work of the appropriate value, 5% of the total executed amount will be deducted and will be reimbursed after the completion of work and signing the final act of acceptance and ensure provision of warranty bond.

Warranty period:

The warranty term for the performed works shall be provided by the Contractor, but anyway not less than 24 months after completion of the work.

Financial warranty:

A bidder is obliged to indicate the information on the terms of execution and submit a work time schedule, which shall be an integral part of the contract;

A bidder is obliged to submit information on the advance payment request if any. Any advance is subject of secure by the bank guarantee. The validity of the bank guarantee issued to secure the advance payment will be valid until the acceptance of the works corresponding to the advance amount, which will be confirmed by the acceptance-delivery act concluded in accordance with the above rule;

Contractor is obliged to submit unconditional Quality guarantee on no less than 5% (including VAT) of the contract/executed total value for minimum 24-month period, and the date will start from signing the final acceptance delivery deed, Client will reserve 5% of contract value from every payment due till the presentation of guarantee.

After signing contract, contractor is obliged to submit unconditional Performance bank guarantee no less than 7% (including VAT) of the total contract value, which will be valid during project execution period.

The above-mentioned guarantees shall be submitted from a banking institution licensed by the National Bank 

Environmental and safety protection:

During the execution of the work, it is necessary to comply with the requirements set out in the tender document and with the requirements of the state safety and environmental normative acts.

The Contractor shall be responsible for the safety of all activities on the Site. The Contractor shall carry out its operations in compliance with all applicable safety, occupational health and environmental protection regulations on site in accordance with Georgian legislation. Client shall be immediately informed in case Contractor’s work presents high risks with environmental and social impact and advise on appropriate measures to manage the situation.

In case of violation of HSE requirement contractor will be penalized.

Non-Negotiable terms in contract is listed below

The Contract shall be governed and construed under the laws of Georgia. 

All disputes arising out of or in connection with the agreement to be concluded, shall be solved through arbitration and submitted to the Georgian International Arbitration Centre.

The Contract shall be executed in the English and Georgian languages, in case of discrepancy the English text shall prevail.

The Client will pay a daily penalty of 0.2% of the delayed amounts.

In case of non-fulfillment or improper fulfilment of obligations, the Contractor shall be penalized by 0.2% of the total contract value for each day.

Language of bid and contract:

 All documents relating to the Bid and contract shall be in English language.

Contract will be on Georgian and English languages, where English language will be privileged.

Workplace preparation:

The Contractor is responsible to:

  • perform work in compliance with labor safety conditions;
  • ensure the minimization of environmental impact within the workplace;
  • minimize the impact of work-related noise, vibration and dust on the environment.

Proposal:

  • Tender documents shall be submitted no later than 8th  of September, 2025, at 18.00 (Georgian time).
  • Tender documents shall be submitted in hard copy (1 copy) and electronically (hard disc).
  • Bidding documents shall be delivered at Tbilisi Hills head office in a sealed envelope and approved with a signature.
  •  A hard copy of the bidding documents shall be certified with the signature of the director of the company and the seal of the company (if any).
  • The proposal shall be valid and binding for Contractor for 60 calendar days from the date of submission.

Please see documents in below link:  Link

  •  Architectural drawings;
  • Appx timeline for works;
  • BOQ formats for 4 villas (For proper evaluating contractor should fill excel file) If the bidder will not provide prices for all works, written in excel file will be rejected. Unit rate should be fixed and only volume will be changed based on execution.
  • Contract draft 

Structural design will be provided in September 2025.

Please download documents from below link:  

Tbilisi Hills Development and Construction LLC will not reimburse the costs of preparing the documents required to participate in the tender.

Tbilisi Hills Development and Construction LLC is ready to hold meetings with representatives of interested companies. For additional information on project please contact:+995 511 28 85 54 Vladimer Sabauri. For additional information on tender procedures please contact: +995 598 29 99 91 Lela Vakhtangishvili

ტენდერის კატეგორია:

  • 43300000 სამშენებლო მანქანები და მოწყობილობები
  • 45200000 მთლიანი ან ნაწილობრივი სამშენებლო სამუშაოები და სამოქალაქო მშენებლობის სამუშაოები
  • 45100000 სამშენებლო უბნის მოსამზადებელი სამუშაოები
  • 44100000 სამშენებლო მასალები და დამხმარე სამშენებლო მასალები
  • 45300000 სამშენებლო-სამონტაჟო სამუშაოები
შეკითხვები